{"id":1912,"date":"2017-02-07T00:58:27","date_gmt":"2017-02-07T00:58:27","guid":{"rendered":"http:\/\/progroupe.net\/?p=5"},"modified":"2017-02-07T00:58:27","modified_gmt":"2017-02-07T00:58:27","slug":"bed-sediment-removal-from-swd-gabcikovo-water-dam","status":"publish","type":"post","link":"https:\/\/progroupe.net\/sk\/bed-sediment-removal-from-swd-gabcikovo-water-dam\/","title":{"rendered":"Bed Sediment Removal from SWD Gab\u010d\u00edkovo Water Dam"},"content":{"rendered":"<h2>Water reservoir Hru\u0161ov, Danube River<\/h2>\n<h4>Location: SWD Gab\u010d\u00edkovo Water Dam \u2013 Water reservoir Hru\u0161ov, Danube River, Slovak Republic<br \/>\nClient: Vodohospod\u00e1rska V\u00fdstavba \u0161. p., Bratislava, Slovak Republic<br \/>\nContractor: Prolake, member of PROGROUPE<br \/>\nEquipment: Hydraulic dredger, processing plant DESET PG-03 built in standard container frames<br \/>\nTotals: 440.000 m\u00b3, 70 tons of dry sediments per hour<\/h4>\n<table width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"50%\">Riverbed sediments transported by the Danube River to Gab\u010d\u00edkovo Water Dam do colmatage bottom of water reservoir Hru\u0161ov. Process of sedimentation and colmatage of the riverbed has impact on gradual decline infiltrated ground water levels to all the major water sources in the vicinity, water flow guidance, flood protection, reduce hydroelectric power, impair the quality of surface water and sediments. List of problems require innovative solutions to remove sediment without limitation of operations on the Danube River.<\/td>\n<td valign=\"top\" width=\"50%\">The aim of the project was to concentrate on reduction of sedimentation and colmatage of the riverbed sediments from water reservoir with small dimensions for processing facility plant. To execute this project we use DESET PG-03 mobile processing facility plant. Extraction with application of DESET PG-03 technology mean in practice constant water level in the reservoir, the reservoir is continuously used and serves its purpose while removing sediment from the bottom without restrictions. Sediments are dredged with sludge suction dredger from reservoir Hru\u0161ov and transport to the processing facility plant where are processed and dewatered. After treatment of sludge, sediments are directly transported off-site by trucks.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Water reservoir Hru\u0161ov, Danube River Location: SWD Gab\u010d\u00edkovo Water Dam \u2013 Water reservoir Hru\u0161ov, Danube River, Slovak Republic Client: Vodohospod\u00e1rska V\u00fdstavba \u0161. p., Bratislava, Slovak Republic Contractor: Prolake, member of PROGROUPE Equipment: Hydraulic dredger, processing plant DESET PG-03 built in standard container frames Totals: 440.000 m\u00b3, 70 tons of dry sediments per hour Riverbed sediments<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/progroupe.net\/sk\/wp-json\/wp\/v2\/posts\/1912"}],"collection":[{"href":"https:\/\/progroupe.net\/sk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/progroupe.net\/sk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/progroupe.net\/sk\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/progroupe.net\/sk\/wp-json\/wp\/v2\/comments?post=1912"}],"version-history":[{"count":0,"href":"https:\/\/progroupe.net\/sk\/wp-json\/wp\/v2\/posts\/1912\/revisions"}],"wp:attachment":[{"href":"https:\/\/progroupe.net\/sk\/wp-json\/wp\/v2\/media?parent=1912"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/progroupe.net\/sk\/wp-json\/wp\/v2\/categories?post=1912"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/progroupe.net\/sk\/wp-json\/wp\/v2\/tags?post=1912"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}